Image: Artemis III ESM3 Engine Nozzle Install Completion (KSC-20260217-PH-JBS01 0002)
Size of this preview: 800 × 534 pixels. Other resolutions: 320 × 213 pixels | 8,192 × 5,464 pixels.
Original image (8,192 × 5,464 pixels, file size: 27.13 MB, MIME type: image/jpeg)
Description: Teams prepare for the installation of the engine nozzle onto the European Service Module for NASA's Artemis III mission on Tuesday, Feb. 17, 2026, inside the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The service module provides the Orion spacecraft's propulsion, thermal control, electrical power, and life support systems during the Artemis III mission to send humans to explore the lunar South Pole region.
Usage Terms: Public domain
Image usage
The following page links to this image:
All content from Kiddle encyclopedia articles (including the article images and facts) can be freely used under Attribution-ShareAlike license, unless stated otherwise.