Image: Critical electrical grid infrastructure in Guánica, Puerto Rico
Size of this preview: 800 × 533 pixels. Other resolutions: 320 × 213 pixels | 5,472 × 3,648 pixels.
Original image (5,472 × 3,648 pixels, file size: 6.72 MB, MIME type: image/jpeg)
Description: U.S. Army Corps of Engineers Task Force Power Restoration contractors complete work on a transmission line in the Guanica State Forest, Puerto Rico, April 6. The line connects the Costa Sur Power Plant in Ponce to Mayaguez. Mayaguez is the eighth-largest municipality in Puerto Rico. The repairs stabilized the system for the region.
Title: Critical electrical grid infrastructure in Guánica, Puerto Rico
Credit: https://www.flickr.com/photos/sadusace/27429079448/
Author: U.S. Army Corps of Engineers
Usage Terms: Public domain
License: Public domain
Attribution Required?: No
Image usage
The following page links to this image:
All content from Kiddle encyclopedia articles (including the article images and facts) can be freely used under Attribution-ShareAlike license, unless stated otherwise.