Image: Limyra Bridge Workflow
Size of this preview: 800 × 128 pixels. Other resolution: 1,250 × 200 pixels.
Original image (1,250 × 200 pixels, file size: 107 KB, MIME type: image/gif, looped, 8 frames, 20 s)
Description: The possible workflow on Limyra Bridge. The double-layered arch construction offered two advantages: Firstly, the falsework could be moved to another opening as soon as the lower arch rib had been completed (saving of time). Secondly, the centering could be built more lightly due to lesser loads (reduction of weight).
Title: Limyra Bridge Workflow
Credit: own work inspired by an illustration in Wurster & Ganzert, p. 298, fig. 15 (see complete reference below)
Author: Hk kng
Usage Terms: Public domain
License: Public domain
Attribution Required?: No