kids encyclopedia robot

Image: Visible progress continues to show at the new Folsom Dam auxiliary spillway Sept. 23 as work on the approach channel and downstream chute take center stage. (21087516643)

Kids Encyclopedia Facts
Original image(4,928 × 3,264 pixels, file size: 13.3 MB, MIME type: image/jpeg)

Description: Construction crews for U.S. Army Corps of Engineers Sacramento District excavate a temporary embankment Sept. 23, 2015, as work continues on the Folsom Dam auxiliary spillway in Folsom, Calif. The Corps will excavate more than 1 million cubic yards of earth and rock to complete the approach channel, which will connect the reservoir to the new spillway. The project is part of a $900-million cooperative effort between the U.S. Army Corps of Engineers, U.S. Bureau of Reclamation, Central Valley Flood Protection Board and the Sacramento Area Flood Control Agency to improve the safety of Folsom Dam and reduce flood risk for the Sacramento area. (U.S. Army photo by Randy Gon / Released)
Title: Visible progress continues to show at the new Folsom Dam auxiliary spillway Sept. 23 as work on the approach channel and downstream chute take center stage. (21087516643)
Credit: Visible progress continues to show at the new Folsom Dam auxiliary spillway Sept. 23 as work on the approach channel and downstream chute take center stage.
Author: U.S. Army Corps of Engineers Sacramento District
Usage Terms: Public domain
License: Public domain
Attribution Required?: No

The following page links to this image:

kids search engine