Clifton Lock facts for kids
Clifton Lock - gates showing some ambivalence over board status (yellow or red)
|
|
Waterway | River Thames |
---|---|
County | Oxfordshire |
Maintained by | Environment Agency |
Operation | Hydraulic |
First built | 1822 |
Length | 39.57 m (129 ft 10 in) |
Width | 5.79 m (19 ft 0 in) |
Fall | 1.03 m (3 ft 5 in) |
Above sea level | 153' |
Distance to Teddington Lock |
79 miles |
Clifton Lock is a lock on River Thames in Oxfordshire, England. It is located south of the village of Clifton Hampden and north of Long Wittenham. It is at the start of the Clifton Cut, which bypasses the river to the north of Long Wittenham. The lock was completed in 1822 by the Thames Navigation Commissioners.
The main weir, which was built thirteen years later than the lock, runs across the old navigation of the river. A smaller weir runs just above the lock.
History
Clifton is one of the few lock sites on the non-tidal river where there was not a pre-existing weir and flash lock, although there was an important ferry. Problems to navigation had long been recognised and the first suggestions for creating a lock "near Clifton Ferry" occurred in 1793, being raised again in 1811.
The construction of the lock cut was delayed because the owner of the land was "a lunatic", but it was eventually completed in 1822 together with the lock. No weir was built at the time, giving rise to complaints. In 1826, the Lord Mayor of London visited Oxford by boat, and the City Barge, shallop and attendant boats were "detained at Clifton a considerable length of time."
The weir was eventually erected on the old navigation in 1835 so the towpath around the old navigation channel fell into disuse. It was enlarged by 1877 and a tumbling bay was created close to the lock. The lock cut bridges were rebuilt in 1884.
Access to the Lock
The lock is at the end of a long track which starts on the A415 road to Abingdon just after it leaves Clifton Hampden (10 mph signs). On the way to the lock, this track meets another track from the end of the High Street Clifton Hampden. The status of these tracks is unclear as signs state "Farm only". The access to the lock from the A415 is not a public road and is limited to authorized persons only!
Reach above the lock
The Clifton cut takes the navigation for nearly a mile before the reaching the weir to the river's natural course past Long Wittenham. The reach is alongside farmland, crossed about halfway along by the Appleford Railway Bridge. Just before Sutton Bridge the river again divides between an old course, now a weirstream, past the old mill at Sutton Courtenay and Sutton Pools; with the navigation following the Culham Cut.
The river meander has some public footpath access, although the Thames Path follows the navigation cutting, and the northern bank all the way to Culham Lock.