Wittpenn Bridge facts for kids

Kids Encyclopedia Facts
Quick facts for kids
Wittpenn Bridge
Wittpenn Bridge.jpg
Wittpenn Bridge, looking east in a 2004 photo
Coordinates 40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
Carries 4 lanes of Route 7
Crosses Hackensack River
Locale Jersey City and Kearny, New Jersey
Official name Wittpenn Bridge
Other name(s) Route 7 Bridge
Maintained by New Jersey Department of Transportation
ID number 0909150
Characteristics
Design Lift bridge
Total length 2,169 feet (661 m)
Width 40 feet (12 m)
Longest span 83 feet (25 m)
Clearance below 35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
Opened November 5, 1930
Statistics
Daily traffic 50,000

The Wittpenn Bridge is a special kind of bridge called a vertical-lift bridge. It helps cars cross the Hackensack River in New Jersey. This bridge connects two towns: Kearny and Jersey City. It is named after H. Otto Wittpenn, who used to be the mayor of Jersey City.

The bridge has four lanes for traffic. It is about 2,169 feet long and 40 feet wide. When it is lowered, the bridge stands 35 feet above the water. A special part of the bridge, called the main lift span, is 209 feet long. Construction on the Wittpenn Bridge started in 1927. It opened for cars on November 5, 1930. About 50,000 vehicles, including 2,000 trucks, use the bridge every day.

When the bridge needs to let tall ships pass, its middle section lifts straight up. This gives ships 100 feet of space to go under. Raising the lift span takes about 15 minutes. For example, in 2005, the bridge was lifted 80 times to let boats pass underneath.

Building a New Wittpenn Bridge

Rte 7 approach to new Wittpenn Bridge 2020 jeh
The new bridge approach in Kearny, 2020

The New Jersey Department of Transportation (NJDOT) is building a brand new Wittpenn Bridge. They are also updating all the roads that lead to it. This big project is expected to cost around $600 million. The money for this comes from the federal government.

The first part of building the new bridge began in July 2011. The whole project is planned to take about 11 years to finish. The new bridge is being built right next to the old one, a little to the north.

Part of the funding for the new bridge comes from the Port Authority of New York and New Jersey. The new bridge was expected to be fully open in 2021. In 2018, there was an investigation by the Federal Aviation Agency (FAA). This happened because an airline wondered if money they paid for using Newark Airport was being used for road projects like the Wittpenn Bridge. These road projects are not owned or run by the Port Authority.

Once the new bridge is finished, it will be part of two important trails. It will carry the East Coast Greenway, which is a very long path for biking and walking. It will also be part of the Meadowlands Connector. This is a New Jersey trail for biking and walking that connects Hudson and Essex counties.

In October 2020, the last main part of the new bridge's deck was put into place. The new bridge was expected to open in spring 2021.