kids encyclopedia robot

Hong Kong–Zhuhai–Macau Bridge facts for kids

Kids Encyclopedia Facts
Quick facts for kids
Hong Kong–Zhuhai–Macau Bridge
West section of Hong Kong-Zhuhai-Macau Bridge (20180902174105).jpg
Carries Motor vehicles
Crosses
  • Pearl River Estuary
    • Lingding Channel
    • Jiuzhou Channel
Locale Pearl River Delta
Website (Chinese site)
(Hong Kong site)
(Macau site)
Characteristics
Design Bridge–tunnel system
Total length 55 kilometres (34 mi)
History
Construction begin 15 December 2009
Construction end 6 February 2018
Construction cost ¥126.9 billion ($126.9 billion)
Opened 24 October 2018, 9 A.M. UTC+8
Hong Kong–Zhuhai–Macau Bridge
HZMB route.svg
Map of the bridge highway and the undersea tunnel (dotted) route of the Hong Kong–Zhuhai–Macau Bridge, between Hong Kong and Macau.
Chinese name
Traditional Chinese 港珠澳大橋
Simplified Chinese 港珠澳大桥
Jyutping Gong2zyu1ou3 Daai6kiu4
Hanyu Pinyin Gǎngzhū'ào Dàqiáo
Transcriptions
Standard Mandarin
Hanyu Pinyin Gǎngzhū'ào Dàqiáo
Yue: Cantonese
Yale Romanization Góngjyūou Daaihkìuh
Jyutping Gong2zyu1ou3 Daai6kiu4
Portuguese name
Portuguese Ponte Hong Kong–Zhuhai–Macau

The Hong Kong–Zhuhai–Macau Bridge, also called the Hong Kong–Zhuhai–Macao Bridge, is a group of bridges and tunnels in the Pearl River Delta. It is 55 kilometres (34 mi) long. It is made up of three bridges, one tunnel, and four artificial islands. It is the longest sea crossing on Earth. The bridges cross the Lingdingyang and Jiuzhouyang sea channels. They also connect Hong Kong, Zhuhai, and Macau.

The bridge is supposed to last for 120 years. The cost of the bridge was about 126.9 billion yuan ($18.77 billion USD). At first, the cost of the bridge was supposed to be 51.1 billion yuan ($7.56 billion USD). The governments of mainland China, Hong Kong, and Macau, as well as some banks, helped pay for the bridge. The bridge was supposed to open in late 2016, but the bridge only finished being built on 6 February 2018. The bridge officially opened on 24 October 2018.

Planning

Gordon Wu, who was the founder of Hopewell Holdings thought of a bridge and tunnel that would connect China, Hong Kong, and Macau. This was in 1983. He said that he got the idea from the Chesapeake Bay Bridge–Tunnel. After that, in 1988, he showed the ideas to the government in Guangzhou and Beijing. In his idea, the bridge would start more north than the design that was actually built. He wanted the bridge to begin at Black Point near Tuen Mun, Hong Kong. It would then cross the Pearl River passing through Neilingding Island and Qi'ao Island. In his idea, the bridge would end at Tangjia and there would be a road from Zhuhai to Macau. The talks between the government and Wu stopped after the Tiananmen Square massacre in 1989. This is because it made foreign investors concerned.

The government of Zhuhai liked this idea and they promoted it. Their name for the bridge was the Lingdingyang Bridge. In the 1990s, Zhuhai built a bridge that connected mainland China and Qi'ao Island. This bridge was supposed to be the first part of the system even though the Chinese and Hong Kong governments did not approve the plan yet. The Chinese government supported the bridge in 1997. The Hong Kong government did not say whether they supported it or not. This is because they were studying traffic between Hong Kong and China and were concerned about the effect this would have on the environment.

To begin the project and making sure things were going to go smoothly, the Advance Work Coordination Group of HZMB was created in 2003. People that worked for the governments of Zhuhai, Macau, and Hong Kong worked on planning the bridge, how the border patrol would work, and how the bridge would be paid for.

In 2009, the governments of China, Guangdong, Hong Kong and Macau agreed to pay for 22% of the bridge. The rest of the money, 78%, was paid for by a lot of banks, like the Bank of China.

Construction

Hong Kong-Zhuhai-Macau Bridge Site HK view 201506
Hong Kong section under construction in 2015 near Lantau Island

The construction of the bridge began on 15 December 2009 in China. Li Keqiang held a starting ceremony. Construction began in Hong Kong in 2011. The construction started later because people challenged the building of the bridge.

The last bridge tower and part of the tunnel was set up on 12 July 2016. The entire tunnel and bridge was finished in the middle of 2017. The entire project was finished in February 2018.

Parts of the bridge

The entire bridge has three sections. One of them was the Main Bridge, which is 29.6 kilometres (18.4 mi) and in the middle of the Pearl River. Another was the Hong Kong Link Road, which was 12 kilometres (7.5 mi) and close to Hong Kong. The third section was the Zhuhai Link Road, which was 13.4 kilometres (8.3 mi) and close to Zhuhai.

Main Bridge

The Main Bridge is the biggest part of the HZMB project. It was built by the managing people from mainland China.

Problems

Number of dolphins

Many environmentalists said that the bridge will hurt the Chinese white dolphins that live in the Pearl River Delta. They said the construction of the bridge will hurt the dolphins' habitat. These dolphins are endangered animals. In the ten years before the bridge opened, the number of these dolphins dropped over 80%.

for China for Hong Kong

Images for kids

See also

Kids robot.svg In Spanish: Puente Hong Kong-Zhuhai-Macao para niños

kids search engine
Hong Kong–Zhuhai–Macau Bridge Facts for Kids. Kiddle Encyclopedia.