kids encyclopedia robot

John C facts for kids

Kids Encyclopedia Facts
Quick facts for kids
John C. Stennis Space Center
NASA logo.svg
Stennis Space Center Test Stand.jpg
The B-1/B-2 Test Stand holding space shuttle components (1987)
Agency overview
Formed 1961
Preceding agencies
  • Mississippi Test Operations
  • National Space Technology Laboratories
Jurisdiction U.S. federal government
Headquarters Hancock County, Mississippi
Agency executive
  • Richard J. Gilbrech, director
Parent agency NASA
Website Stennis Space Center home page

The John C. Stennis Space Center (SSC) is a special place where NASA tests powerful rocket engines. It's located in Hancock County, Mississippi, right on the Pearl River near the border of Mississippi and Louisiana.

As of 2012, Stennis is NASA's biggest place for testing rocket engines. More than 30 different companies and government groups use SSC to test their rockets.

History of Stennis Space Center

NASA needed a place to test the huge rocket engines for the Apollo program. This program aimed to send astronauts to the Moon. The testing site had to be between the rocket factory in New Orleans and the launch site in Florida. It also needed river access, because the rocket parts were too big to move by road.

NASA chose the area in Hancock County, Mississippi, on October 25, 1961. They called it the Mississippi Test Facility. The U.S. Army Corps of Engineers helped buy the land.

About 700 families lived in five small towns in the chosen area. These towns included Gainesville and Logtown. Everyone had to move so the center could be built. NASA bought over 3,200 pieces of land. This included 786 homes, 16 churches, and 19 stores. Some old streets and buildings from these towns can still be seen inside the center.

The test area is about 13,500 acres wide. It is surrounded by a large "buffer zone" of 125,000 acres. This zone helps to reduce the noise from rocket tests. The big concrete and metal test stands were first used to test parts of the Saturn V rockets. These were the rockets that took astronauts to the Moon.

The facility's name changed a few times. On December 18, 1961, it became NASA Mississippi Test Operations. On July 1, 1965, it was renamed Mississippi Test Facility. Then, on June 14, 1974, it became National Space Technology Laboratories. Finally, on May 20, 1988, it was named the John C. Stennis Space Center. This honored Senator John C. Stennis, who strongly supported the space program.

From 1971 onwards, all Space Shuttle Main Engines were tested and approved at Stennis. After the Apollo and Space Shuttle programs ended, the center's use changed. Other government groups and businesses moved in, helping the local economy.

Rocket Propulsion Test Complex

NASA Stennis test complexes on display
An aerial photo shows all three NASA Stennis Space Center (SSC) test complexes - the E Test Complex (foreground), the three A Test Complex stands (middle) and the B Test Complex (back).

The Rocket Propulsion Test Complex was built in 1965. It was very important for developing the Saturn V rocket. The A-1, A-2, and B-1/B-2 test stands are so important that they were named a National Historic Landmark in 1985.

NASA's Engineering & Science Directorate (ESD) at Stennis runs and takes care of these rocket test stands.

A-1 and A-2 Test Stands

Aerial View SSC A-1, A-2 and B test stands 2004
A-1 test stand (foreground), A-2 (mid-ground) and B1/B2 (background)

The A-1 and A-2 stands are two of the first test stands at Stennis. They were built to test the second stage of the Saturn V rocket, called the S-II. This stage was a key part of the Apollo program.

These two stands are made of steel and concrete. They are about 200 feet tall. They can handle a lot of force, over 1 million pounds of thrust. They can also withstand very hot temperatures, up to 6,000 degrees Fahrenheit. The stands provide special fuels like liquid Hydrogen (LH2) and liquid oxygen (LOX). They also supply other gases needed for testing.

Construction of these stands began in 1963 and finished in 1966. The A Test Complex also has a control center, observation bunkers, and other support systems.

Testing the S-II Stage in the 1960s

On April 23, 1966, workers successfully tested the S-II-T, a test version of the Saturn V second stage. This was the first test of a flight-ready S-II stage. It lasted 15 seconds and produced one million pounds of thrust from its five Rocketdyne J-2 engines. This was also the first time the A-2 stand was used.

The first full test of the S-II flight stage happened on May 20, 1966. The S-II-T fired for 354.5 seconds on the A-2 stand. It met most of its goals.

On May 28, 1966, the S-II-T stage broke during a pressure test. Five technicians had minor injuries. The accident happened when the hydrogen fuel tank failed under pressure. An investigation found that the tank was pressurized too much by mistake. This led to stricter rules for testing.

The first flight model of the Saturn V's second stage, S-II-1, arrived at Stennis on August 13, 1966. It was prepared for testing. On December 1, 1966, five J-2 engines were successfully fired for 384 seconds. This was the first time flight-ready hydrogen-fueled engines were tested together.

On December 30, 1966, the first flight version of the Saturn V second stage, S-II-1, was tested again. This test also lasted more than six minutes.

Continued Testing in 1967

On January 11, 1967, the S-II-1 stage finished its checks at Stennis. The S-II-2 stage, for the second Saturn V rocket, arrived on February 11, 1967. It was scheduled for testing in March.

On February 17, 1967, a full-duration test of upgraded J-2 engines lasted 360 seconds. Construction of the S-II A-1 test stand was completed on February 25, 1967.

Testing of the S-II battleship stage with five upgraded J-2 engines ended in late March 1967. These tests lasted about 360 seconds.

Apollo and Shuttle Era Testing

The A-1 and A-2 test stands continued to test S-II stages and J-2 engines until the Apollo program ended in the early 1970s.

In 1971, it was announced that Stennis would test engines for the new Space Shuttle program. The A-1 and A-2 stands were changed to fit the smaller Space Shuttle Main Engines (SSME). Testing officially began on May 19, 1975. The last planned test on the A-2 stand happened on July 29, 2009.

New Engines for the Future

As the Space Shuttle program ended, the A-1 and A-2 stands found new uses. They now test the next generation of rocket engines. This includes the J-2X engine, which is designed for the upper stage of the new Space Launch System (SLS). The first test of this engine happened on December 18, 2007.

Stennis also tests Aerojet Rocketdyne AJ26 rocket engines for Orbital Sciences Corp. These engines power Orbital's Antares rocket, which delivers cargo to the International Space Station.

B-1/B-2 Test Stand

The B-1/B-2 test stand is a huge stand that can test two engines at once. It was built in the 1960s to test the five F-1 engines of a complete Saturn-V S1-C first stage. This happened from 1967 to 1970.

During the Space Shuttle era, it was changed to test the Space Shuttle Main Engine (SSME). Today, Stennis leases the B-1 side to Pratt & Whitney Rocketdyne. They test RS-68 engines for the Delta IV rocket there.

NASA is getting the B-2 side ready to test the core stage of NASA's Space Launch System (SLS). This will happen in late 2016 and early 2017. The SLS core stage, with four RS-25D rocket engines, will be tested there.

On October 17, 1966, a test booster called S-IC-T was shipped to Stennis. It was used to check out the B-2 test stand. All future firings would happen at the B-2 stand.

On December 17, 1966, the S-IC-T was placed in the B-2 test stand. Wiring and connections began right away. Testing would start in early 1967.

B-2 Test Stand in 1967

On February 13, 1967, the B-2 test stand was finished. On March 3, 1967, the S-IC-T was successfully fired for 15 seconds. This first test proved that the stage, equipment, and test facilities worked well together.

A second S-IC-T firing lasted 60 seconds on March 17, 1967. This test confirmed the water flow pattern of the B-2 test stand. It marked the end of the facility checkout tests.

The S-IC-T was removed from the B-2 test stand on March 24, 1967, after its tests were complete.

A-3 Test Stand

NASA has started building a new A-3 test stand at Stennis. The A-3 stand was planned for testing J-2X engines in conditions that copy high-altitude space. It can also be used for sea-level tests.

Because the Constellation Program was cancelled in 2010, the stand might not be used much after it's finished. However, it could be updated for new missions later. Some journalists have criticized the continued building of the $350 million A-3 Test stand, calling it a waste of money.

E Test Stand Complex

E Test Stand at SSC
E test stand complex in 2005

In the 1990s, a new test complex called "E" was built. It tests many new small engines and parts. The E test stand complex has four different test stands.

E1 Test Stand

As of June 2014, the E-1 test stand was not working. This was due to an investigation into a rocket engine failure on May 22, 2014.

E1 History

In 2012, Blue Origin tested a part of its new BE-3 rocket engine at the E-1 test cell. This engine is designed to produce 100,000 pounds of thrust. It will eventually launch Blue Origin's Space Vehicle.

On May 22, 2014, an AJ26 rocket engine failed during a test on the E-1 stand. This engine was for an Orbital Sciences Antares launch. The failure caused major damage to the E-1 test stand.

In June 2015, Aerojet Rocketdyne signed a contract to upgrade the E-1 test stand. This will allow them to test parts of the AR-1 rocket engine there. The goal is for the AR-1 engine to fly after 2019.

E1 Description

The E1 stand has three separate test "cells":

  • E1 Cell 1 can test liquid-propellant and hybrid rockets. It can handle up to 750,000 pounds of thrust in a horizontal position.
  • E1 Cells 2 and 3 test parts of turbopumps. These are important for moving fuel in high-pressure systems.

E2 Test Stand

The E-2 Cell 1 test facility at Stennis has two separate test stands. One tests engines mounted horizontally, and the other tests them vertically. Both can support engines with up to 100,000 pounds of thrust.

This facility can provide many different fuels and gases. These include Liquid Oxygen, Liquid Nitrogen, and Liquid Hydrogen.

E2 Cell 1 was built in 1993. It was originally used to help develop materials for the National Aerospace Plane.

After 2013, the E2 test stand will be changed to test liquid methane engines. SpaceX is helping to fund these changes. The methane testing abilities will become a permanent part of Stennis. Other users can use them after SpaceX finishes their lease.

The most recent test on the E-2 test stand in 2013 was a NASA test of chemical steam generators.

Starting in 2014, SpaceX began testing parts of their liquid methane/liquid oxygen Raptor rocket engine on the E-2 test stand. The full Raptor engine is too big for this stand. By June 2015, SpaceX had completed tests of the main injector and a preburner component for Raptor.

E3 Test Stand

The E3 test stand has two test cells. They are used for testing smaller parts and pilot-scale combustion devices.

  • E3 Cell 1 can support devices up to 60,000 pounds of thrust in a horizontal position. It can use propellants like LOX/hydrocarbon and gaseous oxygen/hydrogen.
  • E3 Cell 2 can support devices up to 25,000 pounds of thrust in a vertical position. It uses similar propellants, plus hydrogen peroxide.

Tests done here in the late 1990s helped lead to the sale of hybrid rocket motors. An American Rocket Company (AMROC) hybrid rocket motor was test-fired at Stennis in 1994.

E4 Test Stand

The E4 test stand was suggested in 2000. It is a single test cell. However, it needs better utilities and road access before it can be used.

H-1 Test Stand

In 2001, the Pentagon suggested building a $140 million facility at the Stennis H-1 test stand. This was to test a proposed Space-Based Laser (SBL). The facility would evaluate a powerful hydrogen fluoride laser.

Since 2007, the British company Rolls-Royce plc has been running an outdoor aero-engine test facility here. Rolls-Royce built this facility because of noise concerns at their UK testing site. In 2013, Rolls-Royce opened a second test stand at Stennis.

Tenant Facilities

In 2005, over 30 government agencies and private companies were located at Stennis. The largest group was the United States Navy, with about 3,500 people. This was much larger than the number of NASA employees.

Some of the important groups located at Stennis include:

US National Oceanic and Atmospheric Administration

The National Data Buoy Center (NDBC) is part of NOAA's National Weather Service. NDBC designs, builds, operates, and maintains a network of data-collecting buoys and coastal stations. These help forecast weather.

US Geological Survey

  • The US Geological Survey Hydrologic Instrumentation Facility. This group works with water-related instruments.

United States Navy

  • The Naval Meteorology and Oceanography Command (NAVMETOCCOM). This group provides weather and ocean information to the U.S. military.
  • A branch of the Naval Research Laboratory. They conduct scientific research for the Navy.
  • The Naval Oceanographic Office (NAVOCEANO). They provide oceanographic products and services to the Department of Defense.
  • The Department of the Navy, Office of Civilian Human Resources, Stennis Operations Center.
  • Navy Special Boat Team 22 and NAVSCIATTS (Naval Small Craft Instruction and Technical Training School).

University

  • Mississippi State University
  • The University of Southern Mississippi's High Performance Visualization Center. This center works with advanced computer graphics.
  • The University of Southern Mississippi's Department of Marine Science. This department studies the ocean.
  • Mississippi State University - Industrial Technology Department.

Commercial

  • Rolls-Royce Outdoor Engine Testing Centre.
  • United Launch Alliance engine testing.
  • The Lockheed Martin Mississippi Space and Technology Center.

INFINITY Science Center

The INFINITY Science Center is the official public visitor and science museum for the John C. Stennis Space Center. This 72,000-square-foot building is next to the Mississippi Welcome Center.

When you visit, you can take a bus tour behind the scenes at Stennis Space Center. The center has many interactive exhibits about NASA, space, planets, stars, weather, and earth science. You can see a full-sized International Space Station module. There's also a model of the Orion spacecraft. Outside, you can see an F-1 rocket engine, a tsunami buoy, and a U.S. Navy training boat.

The INFINITY Science Center opened in April 2012. It replaced the older StenniSphere visitors center.

StenniSphere

The old museum and visitor center for Stennis Space Center was called StenniSphere. It closed on February 15, 2012, when the new INFINITY Science Center was about to open. Unlike INFINITY, StenniSphere was located inside the Stennis Space Center grounds. Its exhibits focused on NASA, space exploration, science, and weather. Many of these exhibits were moved to the new INFINITY Science Center.

Images for kids

kids search engine
John C Facts for Kids. Kiddle Encyclopedia.