kids encyclopedia robot

Thomson-East Coast MRT Line facts for kids

Kids Encyclopedia Facts
Quick facts for kids
Thomson-East Coast Line
[东部地区地铁线] Error: {{Lang}}: unrecognized language code: gb (help)
MRT map TS.svg
The Thomson-East Coast Line's colour and route are not confirmed.
Overview
Status Under Construction (Stage 1, 2 & 3)
Architectural and engineering consultancy studies (Stage 4 & 5)
Owner Land Transport Authority
Termini Woodlands North
Sungei Bedok
Stations 31
Service
Type Rapid transit
System Mass Rapid Transit (Singapore)
Services 1
Operator(s) To be announced
Rolling stock CT251
History
Opened 2019
Technical
Line length 21 km (13 mi)
Character Underground
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Operating speed 80km/h

The Thomson-East Coast Line (TEL) is a brand new train line being built in Singapore. It will be the sixth Mass Rapid Transit (MRT) line in the country. This line will be special because it is fully automated, meaning it runs without a driver!

The TEL will be about 43 kilometers (27 miles) long. It will have 31 stations when it is fully ready. The idea for the Thomson Line part was first shared in 2012. The Eastern Region Line part was announced in 2014. Later, these two plans were combined to form the Thomson-East Coast Line.

This new line will open in five different parts, starting from 2019. It will connect with all the other existing train lines in Singapore. Once the first three parts are open, it is expected to serve around 500,000 people every day. This will make it much easier for many people to travel around Singapore.

Stations Along the Line

The Thomson-East Coast Line will have many stations. These stations are being built in different stages. Some stages are already under construction, while others are still being planned. This table shows all the stations and which stage they belong to. It also shows if a station connects to other train lines.

Station Number Station Name Interchange/Notes
Stage 1 (under construction)
 TE1  Woodlands North
 TE2  NS9  Woodlands North South Line
 TE3  Woodlands South
Stage 2 (under construction)
 TE4  Springleaf
 TE5  Lentor
 TE6  Mayflower
 TE7  Bright Hill
 TE8  Upper Thomson
 TE9  CC17  Caldecott Circle Line
Stage 3 (under construction)
 TE10  Mount Pleasant
 TE11  DT11  Stevens Downtown Line
(under construction/planning)
 TE12  Napier
 TE13  Orchard Boulevard
 TE14  NS22  Orchard North South Line
 TE15  Great World
 TE16  Havelock
 TE17  EW16  NE3  Outram Park East West Line
North East Line
 TE18  Maxwell
 TE19  Shenton Way
 TE20  NS27  CE2  Marina Bay North South Line
Circle Line
 TE21  Marina South
 TE22  Gardens by the Bay
Stage 4 (under planning)
 TE23  Tanjong Rhu
 TE24  Katong Park
 TE25  Amber
 TE26  Marine Parade
 TE27  Marine Terrace
 TE28  Siglap
 TE29  Bayshore
Stage 5 (under planning)
 TE30  Bedok South
 TE31  DT37  Sungei Bedok Downtown Line
(under construction/planning)
kids search engine
Thomson-East Coast MRT Line Facts for Kids. Kiddle Encyclopedia.